| SL No. | Subject of Work | Completion Date |
|---|---|---|
| 1. | IPRCL- Preparation and approval of completion Dwg. and agreement plan of BOT Phase-i of PPT | 10.09.2020 |
| 2. | IPRCL- Track linking work between the BOT down line and the existing siding no 18 & 19 and siding no. 6 & 7 | 16.12.2020 |
| 3. | PRCL- Preparation of Alt. Dwg., OHE Layout plan, signaling Interlocking plan and Cost Estimate of PEQCTPL | 14.04.2021 |
| 4. | IPRCL- Conducting Preliminary Survey & fixation of alternative alignment, submission of land plan & land schedule, various drawing for finalization of coal evacuation from Radhikapur West Coal Block to Jarapada Station of East Coast Railway | 22.06.2021 |
| 5. | IPRCL- Conducting Reconnaissance Survey on topo sheet & fixation of alternative alignments, including submission of comparative abstract cost of all alternatives for finalization of coal evacuation from jamkhani & Kurloi North coal mines to nearest rail heads | 25.11.2021 |
| 6. | IPRCL- Traffic projection, validation for movement of Iron ore between Khondbond & Kalamanga (TSLBSL) mines to Nayagarh/Jaroli/Banspani/Jalpaposi (upcoming) siding | 27.12.2021 |
| 7. | IPRCL- Preparation of Feasibility study for West Bokaro chainpur Railway Siding of M/s Tata Steel Ltd. to accommodate 3nos. of RLS along with modifications in tracks for seamless operation of trains with S.E Railway Network | 15.03.2022 |
| 8. | Feasibility study for Development of siding to handle 10 MTPA volume of coal at Radhikapur West mine taking off from upcoming putagadia Station of MCRL for Vedanta Limited, Jharsuguda. | 10.05.2022 |
| 9. | Execution of all works required for diversion of forest land in accordance to Forest Conservation Act, (FCA), 1980 and Forest (Conservation) Second Amendment Rules, 2014 or Latter amendment, assistance to acquisition of Tenancy land as per The Railway (Amendment) Act,2008 and assistance to transfer of Govt land to South Eastern Railway in connection to construction of Jharsuguda-Sardega New Railway Line(Phase-I). | 14.03.2022 |
| 10. | Feasibility Study for development of dedicated Rail Siding of Kurloi north coal mines, taking off from Belpahar station for loading of coal of Vedanta ltd. | 03.11.2022 |
| 11. | Conducting final location survey, submission of plan & L-section, ESP, GAD of Major Bridges/Minor Bridges/ROB/RUB & detailed estimate for DPR of West Bokaro siding of TSL at Chainpur | 19.12.2022 |
| 12. | Consultancy services for all works pertaining to forest land (1.44 Ha Approx.) diversion work for the diversion of existing OPTCL transmission line from filling the application till getting the final approval from DFO, Sundargarh and other concerned Government Authorities. | 21.01.2023 |
| 13. | Part-A:- For engineering survey and preparation of survey drawing Part-B:-Preparation of plan L-section, typical section, lands fixing of PCL etc. Part-C:-for carrying out final location survey preparation & submission of gads, fixing of TBM, row pillars and preparation of DPR etc. | 24.01.2023 |
| 14. | Conducting Feasibility survey of Alternative alignments for Feasibility Study of railway Siding to JPL/Nearby Location | 23.02.2023 |
| 15. | Conducting Design, Engineering & Planning of independent captive road to the proposed TSL siding at Jalpaposhi from public/Highway/Road network, internal road network, storage & retrieval of iron ore for 10 days dispatch | 28.03.2023 |
| 16. | DPR for Construction of 4 lane Borigumma Bypass Design Change Km 317/700 to Km 321/415 for the year 2022-23 Traffic survey such as 7 days traffic court (TVC) OD survey, Axle load survey etc Preparation of DPR including Topographic survey, investigation conducting sub. Soil exploration project financial & Bio metrical analysis, preparation of Estimate BOQ EPC document etc. | 31.03.2023 |
| 17. | Conducting Detailed Topographical Field Survey Fixing of Permanent benchmark Survey, Preparation, submission, Coordination and assistance to ICON during the approval of ESP, Station Yard Plan L-section Drawings index Plan and Index Section etc. by EAST Cost Railway or any other agency as per the Indian railway guidelines for the Angul-Balaram-putagadia- jarapada-Tentuloi section MCRL Rail corridor project under jurisdiction of the EAST Coast Railway in the state of Odisha | 10.07.2023 |
| 18. | Preparation and submission of Detailed Project Report including Bil of Quantities, Estimates and Drawings for the proposed Independent Captive Road of The Singareni Collieries Company Limited (A Govt. Company) starting from Jarapada-Chhendipada ODR to the Proposed Goods Shed at Jarapada Railway Station. | 01.08.2023 |
| 19. | Pre-Feasibility Study Report for the proposed private siding taking of from Budhapank Station by M/s GD Multiventures and M/s Logistic Solutions at Angul District under East Coast Railway as per the extant railway Policy of Gati Shakti Multi Modal Cargo Terminal (GCT). | 12.12.2023 |
| 20. | Providing Consultancy services for pre-bid activities to proposed goods shed siding of Kalyani TranscoPvt.Ltd. | 14.12.2023 |